future plan
Future Plan
- Installation of Roof Top Grid Connected Solar Photovoltaic Power Plant at Additional 900 Nos. of Schools @ 10 kW each and 50 Nos. of Colleges @ 20 kW each and Cumulative Capacity 10 MW. Total financial outlay for implementation of the project shall be Rs. 107.70 Crore.
- Installation of 20 nos. Roof Top Grid Connected Solar Photovoltaic with cumulative capacity of 1 MW and 2 BIPV Power Plants of cumulative Capacity 0.2 MW [Total : 1.2 MW]. Total financial outlay for implementation of the project shall be Rs. 6.86 Cr.
- Observation of various days related to environment / science / energy sources etc. in all districts in West Bengal. Total financial outlay for implementation of the project estimated to Rs. 1.50 Cr.
- Waste to Energy Programm – target coverage is 5 nos. pilot projects. Total financial outlay for the incentives shall be Rs. 1.00 Cr.
- Decentralized Renewable Energy (DRE) for Livelihood Programme with specific applications useful for SHG, Fishery, MSME and Agriculture Sectors etc.. Total financial outlay for the scheme shall be Rs. 5 Cr.
- Wind Energy programme - survey and first phase of installation works at Mousumi Island, Sagar, Freserganj, Delo, Tonglu, Sandakphu –Falut, Panbu Dara, GiddaPahar Total financial outlay for the programme shall be Rs. 5.00 Cr.
- A new Renewable Energy Policy for the State of West Bengal is being formulated.